1. Specification
Everything starts with the task: what the panel has to control, which drives, sensors and actuators will be connected, the supply voltage, the ambient conditions (temperature, humidity, dust) and where the panel will be installed. Existing schematics, or an old panel that needs replacing, are a good starting point.
2. Schematic
Based on the specification, an electrical schematic is prepared: power supply and protection, control circuits, controller inputs and outputs, and connections to other equipment. We agree the schematic with you before production starts.
3. Component selection
We select components from various manufacturers – optimally for price and delivery time. If your plant already uses controllers or drives from a particular manufacturer, we can follow the same standard, which makes maintenance and spare parts easier.
4. Assembly and testing
The panel is assembled, wires and terminals are labelled and the panel is tested. Documentation and schematics are supplied with the panel.
5. Installation and commissioning
If required, we also carry out the electrical work up to the machine: power supply, cable laying and connection. If needed – controller programming and commissioning.
What to prepare before an inquiry
- A short description of the machine or process.
- Existing schematics, photos or documentation of the old panel, if available.
- A list of motors and drives with their power ratings.
- Preferred component manufacturers, if any.
- Installation location and ambient conditions.
More about the service – control panels. Send your specification to [email protected] and we will send a quote.